Shelby Mechanical was brought in to complete a targeted plumbing upgrade for a commercial restroom renovation and beverage station addition for a Wendy’s Location. Focused on efficiency, code compliance, and minimal disruption, our team delivered a clean, professional installation that aligned perfectly with the project specifications and schedule.
Bathroom Renovation & Fixture Upgrades
Our team installed all-new plumbing to tie into the existing sanitary and vent lines, verified onsite for accuracy and code compliance. The bathroom areas included:
- (2) Tank-style toilets and (2) wall-mounted lavatories with faucets, mixing valves, and trap wraps
- (1) Floor drain per restroom, each with Sure Seal trap inserts
- (1) Toilet replacement using the existing drain and water supply
- (1) Lavatory replacement with new wall-mounted sink and faucet using existing lines
Foam pipe insulation was installed on all water lines, and all water lines were PEX with copper stub-outs for durability.
Utility Sinks & Specialty Installations
We delivered precise plumbing installations for a variety of utility and commercial-grade sinks:
- (3) Stainless steel drop-in sinks with S1 T6 faucets
- (1) Stainless steel double drop-in sink with S6 T10 faucet
- (1) Stainless steel scrub sink with S15 faucet
- (3) Floor sinks, including one cast iron floor sink with a cast iron drain to handle high-temperature sterilizer waste
- (1) Replacement 24″x24″ mop sink with faucet, reusing existing drain and supply lines
We also installed a customer-supplied in-line water softener and filtration system, ensuring clean, treated water supply throughout the facility.
Safety & Specialty Equipment Connection
Our plumbing scope also supported key safety and utility features within the facility:
- (1) Floor drain installed beneath the ice machine
- Water line supply to both the refrigerator and the ice machine
- (1) Eyewash station supplied and installed
- (1) RPZ backflow preventer with shut-offs for cross-connection protection
- Water lines and drains installed for the sterilizer
Materials & Coordination
Shelby Mechanical supplied all plumbing fixtures unless otherwise specified in the project documentation. Drainage and vent piping was installed using SCH40 PVC. Our team made a dedicated site visit to mark saw cuts for concrete work.
Shelby Mechanical’s detail-oriented approach ensured a code-compliant, high-performance plumbing system that supports the daily operations of this upgraded facility. Our ability to coordinate with other trades, adapt to evolving onsite needs, and maintain a clean and organized work environment helped drive this project to success.
Let us bring the same level of professional plumbing expertise to your next commercial renovation. Contact Shelby Mechanical today for dependable solutions that stand the test of time.